NSC - Regal, Cleveland, Grace, Greene, Jackson, Ralph Water & Sewer Replacements and Casings

This project consists of the construction of approximately 385 feet of 48” and 54” steel casings installed by boring and open cut, 4,200 feet of 30” ductile iron water pipe, 1,530 feet of 36” ductile iron water pipe, 280 feet of 8” ductile iron water pipe, 815 feet of 12” pvc sanitary sewer pipe, 156 linear feet of storm sewer, 3 drainage structures, bio-infiltration swales, 1900 linear feet of sidewalk, 4,200 square yards of 3-inch thick HMA pavement 800 square yards of 4-inch thick HMA pavement, 2,200 square yards of 5-inch thick HMA pavement, 3,000 square yards of 8-inch thick HMA pavement, sundry utility adjustments, and other related miscellaneous items.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Project Information 2.2 MB
02 - Amendments to the Standard Specifications 150.8 KB
03 - Special Provisions 668.5 KB
04 - Special Provisions - Technical 1.7 MB
05 - Appendix A - Detail Drawings 16.2 MB
06 - Appendix C - City-State-Federal Funding Required Inserts 358.8 KB
07 - Appendix D - Quantity Estimates 633.7 KB
08 - Appendix E - Permits 6.3 MB
09 - Appendix H - Traffic Signs 181.0 KB
10 - Appendix P - Proposal 664.6 KB
11 - Appendix W - Wage Rates Information 1.2 MB
12 - Appendix Z - Payment Items 359.3 KB