2020 Arterial Grind & Overlay South - Economic Recovery - 2020087

This project consists of the grind and overlay of arterial roadways at three separate locations in north Spokane. This project consists of the 48,000 square yards of 2-inch thick HMA pavement and planning of existing HMA pavement, 10,200 square yards of pavement repair excavation, 300 square yards of cement concrete sidewalk for ADA ramp construction, and 425 lineal feet of curb or curb & gutter, sundry utility adjustments, and other related miscellaneous items.
  Addendum #1 (click to expand/collapse)
Name Size
2020087 ADDENDUM 1 3.9 MB
  Addendum #2 (click to expand/collapse)
Name Size
2020087 ADDENDUM NO. 2 Updated 499.2 KB