2020 Arterial Grind & Overlay North - Economic Recovery - 2020083

This project consists of the grind and overlay of arterial roadways at three separate locations in north Spokane. This project consists of the 71,700 square yards of 2-inch thick HMA pavement and planning of existing HMA pavement, 3,700 square yards of pavement repair excavation, 925 square yards of cement concrete sidewalk for ADA ramp construction, and 1,200 lineal feet of curb or curb & gutter, sundry utility adjustments, and other related miscellaneous items.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Project Information 1.3 MB
02 - Amendments to the Standard Specifications 148.6 KB
03 - Special Provisions 669.0 KB
04 - Special Provisions - Technical 1.9 MB
05 - Appendix A - Detail Drawings 9.9 MB
06 - Appendix C - City-State-Federal Funding Required Inserts 1.0 MB
07 - Appendix D - Quantity Estimates 69.5 KB
08 - Appendix E - Permits 7.8 MB
09 - Appendix P - Proposal 1.1 MB
10 - Appendix W - Wage Rates Information 1.4 MB
11 - Appendix Z - Payment Items 349.0 KB