2021 Street Maintenance ADA Ramps - 2020042

This project consists of the construction of approximately 80 ADA accessible wheelchair ramps, including 2,700 linear feet curb removal and replacement, 1,600 square yards of sidewalk, pavement repair, sundry utility adjustments, and other related miscellaneous items.
  Addendum #1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2020042 ADD 1 Monument List 53.8 KB
2020042 Addendum No. 1 487.1 KB
2020042 Bid Items Addendum 1 121.9 KB
Appendix D Sign Estimate 22.3 KB
Detail Drawings 945.4 KB
Prop Work REV1 58.7 KB
  Tree Scope of Work (click to expand/collapse)
This is available for download & digital takeoff to registered users Log in now
Name Size
2020042 Full Tree Scope of Work 8.0 MB