Centennial Trail - Summit Blvd. Gap - 2017080

This project consists of the construction of approximately 2700 cubic yards of excavation and embankment, 6100 square feet of Structural Earth Wall, 10 drainage structures, 5800 linear feet of curb, 5175 square yards of 2-inch thick HMA paved trail, sundry utility adjustments, and other related miscellaneous items.
  Addendum #1 (click to expand/collapse)
Name Size
2017080 Addendum No. 1 9.3 MB
  Addendum #2 (click to expand/collapse)
Name Size
2017080 Addendum 2 247.4 KB
  Addendum #3 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
272-040A 107.2 KB
2017080 Addendum #3 481.2 KB