Cycle 8 (2019) School Safety - 2019064, 065, 066

This project consists of the construction of approximately 2,603 square yards of sidewalk , 54 linear feet of storm sewer, 6 drainage structures, 3,556 linear feet of curb or curb and gutter, 1,400 square yards of 2-inch thick HMA trail, 2,000 square yards of 3-inch thick pavement patching, 220 square yards of 5-inch thick pavement patching, 2 Pedestrian Hybrid Beacon System – RRFB’s, 9 sets of “20 MPH when flashing” driver feedback signs, sundry utility adjustments, and other related miscellaneous items.
  Addendum #1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2019064 Addendum #1 275.7 KB
Appendix P Bid Items Addendum 1 49.5 KB
Tree Protection Scope of Work-School Safety District 2-South 3.4 MB
Tree Protection Scope of Work-School Safety District 3-Northwest 7.2 MB
  Addendum #2 (click to expand/collapse)
Name Size
2019064 Addendum #2 362.7 KB