Cycle 8 (2019) School Safety - 2019064, 065, 066

This project consists of the construction of approximately 2,603 square yards of sidewalk , 54 linear feet of storm sewer, 6 drainage structures, 3,556 linear feet of curb or curb and gutter, 1,400 square yards of 2-inch thick HMA trail, 2,000 square yards of 3-inch thick pavement patching, 220 square yards of 5-inch thick pavement patching, 2 Pedestrian Hybrid Beacon System – RRFB’s, 9 sets of “20 MPH when flashing” driver feedback signs, sundry utility adjustments, and other related miscellaneous items.