Hoffman Well Rehabilitation - 2018104

This project consists of the construction and rehabilitation of the Hoffman Well, including vertical turbine line shaft pumps, motors, motor control centers, steel casing liner, concrete pedestal, 8”, 18” and 24” to 30” diameter piping, electrical, concrete vaults, excavation, site grading and restoration, structural modifications to well caisson, fencing, water and sewer connections, electrical and conduit work, and other related miscellaneous items.

Status

Accepting Bids

Bid Date6/21/21 1:00 pm

Company & Contacts

City of Spokane Engineering Dept.

David St. Pierre dstpierre@spokanecity.org   (509) 625-6700

Location

Spokane, WA

Project Estimate: $2,240,448 – $2,899,403

Bidders may download electronic files at no cost. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.

Additional project information including the Engineer’s estimated cost range for the project, bid results (after bid opening), as well as information about other City projects are available by following this link for The City of Spokane Engineering Services.