Cycle 8 (2018) Traffic Calming - 2018065, 066, 067

This project consists of the construction of approximately 1,850 square yards of sidewalk, 50 linear feet of storm sewer, 2 drainage structures, 2150 linear feet of curb or curb and gutter, 650 square yards of 3-inch thick pavement patching, 335 square yards of 5-inch thick pavement patching, 1 Pedestrian Hybrid Beacon System – RRFB’s, 2 sets of “Driver Speed Feedback” signs, sundry utility adjustments, and other related miscellaneous items.
  Addendum #1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2018065-067 Addendum No. 1 365.4 KB
2018065-67 MA - DISTRICT 3-D3-2 (ADDENDUM 6-7-21)19 340.2 KB
  Addendum #2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2018065 Local Agency Proposal Signature Page 163.8 KB
2018065-067 Addendum No. 2 442.1 KB