Cycle 8 (2018) Traffic Calming - 2018065, 066, 067

This project consists of the construction of approximately 1,850 square yards of sidewalk, 50 linear feet of storm sewer, 2 drainage structures, 2150 linear feet of curb or curb and gutter, 650 square yards of 3-inch thick pavement patching, 335 square yards of 5-inch thick pavement patching, 1 Pedestrian Hybrid Beacon System – RRFB’s, 2 sets of “Driver Speed Feedback” signs, sundry utility adjustments, and other related miscellaneous items.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 2018065-67_MASTER COVER_G-0 955.6 KB
02 2018065-67_DISTRICT 1 COVER_G-1 478.0 KB
03 2018065-67_MA - DISTRICT 1-D1-1 512.1 KB
04 2018065-67_MA - DISTRICT 1-D1-2 378.2 KB
05 2018065-067 S&S COOK ST T-1 645.6 KB
06 2018065-067 DRIVER FEEDBACK NEVADA T-2 515.6 KB
07 2018065-067 CHIEF GARRY PARK LANDSCAPE L-1 260.4 KB
08 2018065-067 CHIEF GARRY PARK IRRIGATION L-2 269.1 KB
09 2018065-067 CHIEF GARRY PARK LS AND IRR DETAILS L-3 379.2 KB
10 2018065-67_DISTRICT 2 COVER_G-2 654.6 KB
11 2018065-67_MA - SHEET C2-1 429.6 KB
12 2018065-67_MA - DISTRICT 2-D2-1 478.6 KB
13 2018065-67_MA - DISTRICT 2-D2-2 338.2 KB
14 2018065-067 S&S 2ND-OAK T-3 410.1 KB
15 2018065-067 S&S 14TH-CEDAR T-4 535.4 KB
16 2018065-067 S&S MILTON, BERNARD T-5 631.6 KB
17 2018065-67_DISTRICT 3 COVER_G-3 596.7 KB
18 2018065-67_MA - DISTRICT 3-D3-1 378.0 KB
19 2018065-67_MA - DISTRICT 3-D3-2 328.1 KB
20 2018065-067 RRFB, S&S POST, COLUMBIA T-6 743.6 KB
21 2018065-067 DRIVER FEEDBACK ASSEMBLY T-7 607.7 KB
22 2018065-067 DRIVER FEEDBACK ASSEMBLY T-8 490.5 KB