CSO Basin 24 Control Facility (Phase 4) Bid Packages 5, 6, 7, 9, 11, & 12 (Re-Bid) - SUB-BIDS

BP5 – REBAR: Furnishing and installing reinforcing steel for approximately 6,500 cubic yards cast-in-place concrete structure. BP6 – CONCRETE SUPPLY: Supplying approximately 6,500 cubic yards structural concrete. BP7 – METAL FABRICATION: Supply and prefabricate all metal stairways, railings, weirs, baffles, columns, embeds, and all other miscellaneous metal items. BP9 – WATERPROOFING: Supply and install approximately 1,514 sy of concrete wall waterproofing. BP11 – ODOR CONTROL UNIT: Supply of three (3) odor control units and media including delivery, startup and training for equipment. BP12 – LIFT STATION PUMPS: Supply of three (3) submersible non-clog wastewater pumps (Flygt Movel NP-3153 LT 3-414) including delivery, startup and training for equipment.

Status

Bidding Closed

Bid Date8/29/17 2:00 pm

Company & Contacts

Walker Halme Joint Venture

Ed Walker ewalker@walkerconstructioninc.com   Justin Paine jkpaine@walkerconstructioninc.com

Location

Spokane, Eastern WA

Bidders may download digital documents at no cost. Printed documents are available, at bidders expense, by selecting the “Order” option.