CSO 23-1 & 23-2 Control Facilities - 2010076

This project consists of the construction of approximately ±600 linear feet of 10” to 48” PVC sanitary/storm sewer, 8 drainage structures, ±600 linear feet of sidewalk, ± 2,700 square yards of 3” and 5”-inch thick asphalt pavement, 2 pre-cast vaults, flow control devices, concrete pavement panel replacement, sundry utility adjustments, and other related miscellaneous items. Scope of work includes the following: Civil Construction , Sanitary Sewer, Asphalt, Concrete, Cubs & Gutters, Erosion Control, Sidewalks

Status

Bidding Closed

Prebid Date11/15/17 1:00 pm

Bid Date12/4/17 1:00 pm

Company & Contacts

City of Spokane Engineering Dept.

Duane Studer   509-625-6700

Location

Spokane, Eastern WA

Documents

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

Project Estimate: $1,289,000 – $1,391,000

A prebid conference will be held at the office of the basement level of Spokane City Hall (W. 808 Spokane Falls Blvd. Spokane, WA 99201) in the Council Briefing Center at 1:00p.m. on Wednesday, November 15, 2017. Attendance is highly encouraged.

Additional project information including the Engineer’s estimated cost range for the project, bid results (after bid opening), as well as information about other City projects are available by following this link for The City of Spokane Engineering Services.