Central Avenue Well #2 Rehabilitation - 2016133

This project consists of the construction of a concrete masonry unit building measuring approximately 16' x 30', installation of City supplied deep well vertical line shaft turbine pump, drive and motor control centers, 8" to 24" diameter building piping, 4" to 24" diameter site piping, concrete vault, sidewalk removal and replacement, pavement removal and replacement, sundry utility adjustments, installation of drywells and landscaping, and other work items. Scope of work includes the following: Civil Construction , Excavation / Earthworks, Sanitary Sewer, Stormwater, Asphalt, Landscape / Irrigation, Sidewalks

Status

Bidding Closed

Prebid Date11/27/17 11:00 am

Bid Date12/4/17 1:00 pm

Company & Contacts

City of Spokane Engineering Dept.

Technical: Joe Foote, MSA 509-321-0340   Procedural: Dan Buller 509-625-6700

Location

Spokane, Eastern WA

Documents

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

Project Estimate: $1,000,000 – $1,200,000

A prebid will be held at the site (5903 N Normandie St) at 11:00 a.m. on November 27, 2017.

Additional project information including the Engineer’s estimated cost range for the project, bid results (after bid opening), as well as information about other City projects are available by following this link for The City of Spokane Engineering Services.