High Drive from 29th Avenue to 21st Avenue - 2015127

This project consists of the construction of approximately of roadway excavation and embankment,+27,580 s.y. of 2-inch, 3-inch, and 3.5-inch deep HMA roadway and pedestrian pathway paving, paving, +4,415 c.y. of crushed base, +3,030 linear feet of CSO and storm sewer, Infiltration swale construction, infiltration trench, drainage structures, landscaping and irrigation, curb and sidewalk construction pavement, sundry utility adjustments, and other related miscellaneous items.

Status

Bidding Closed

Bid Date4/23/18 1:00 pm

Company & Contacts

City of Spokane Engineering Dept.

Cindy Kinzer   509-625-6700

Location

Spokane, Eastern WA

Documents

Project Estimate: $2,700,000 – $3,000,000

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

Additional project information including the Engineer’s estimated cost range for the project, bid results (after bid opening), as well as information about other City projects are available by following this link for The City of Spokane Engineering Services.