NSC Euclid Avenue Water and Sewer and NSC North Hill Distribution Loop

This project consists of the construction of approximately +205 linear feet of sanitary sewer, +205 linear feet of 30-inch water transmission main, +2,580 linear feet of water distribution main, +320 linear feet of 36” and 48” steel casing pipe with both open cut and trenchless installation, shoring and adjacent utility support, remove and replace cement concrete panels, HMA pavement patching, communication conduits, cables, and interfaces, curb and sidewalk removal and replacement, sundry utility adjustments, and other related miscellaneous items.
  Addendum #1 (click to expand/collapse)
Name Size
2017160 Addendum No 1 3.8 MB