NSC Euclid Avenue Water and Sewer and NSC North Hill Distribution Loop

This project consists of the construction of approximately +205 linear feet of sanitary sewer, +205 linear feet of 30-inch water transmission main, +2,580 linear feet of water distribution main, +320 linear feet of 36” and 48” steel casing pipe with both open cut and trenchless installation, shoring and adjacent utility support, remove and replace cement concrete panels, HMA pavement patching, communication conduits, cables, and interfaces, curb and sidewalk removal and replacement, sundry utility adjustments, and other related miscellaneous items.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Project Information 1.2 MB
02 - Amendments to the Standard Specifications 643.4 KB
03 - Special Provisions 283.5 KB
04 - Special Provisions - Technical 803.1 KB
05 - Appendix A - Detail Drawings 19.5 MB
06 - Appendix C - City-State-Federal Funding Required Inserts 718.7 KB
07 - Appendix D - Quantity Estimates 541.8 KB
08 - Appendix E - Permits 1.4 MB
09 - Appendix H - Traffic Signs 534.6 KB
10 - Appendix P - Proposal 1.0 MB
11 - Appendix W - Wage Rates Information 2.5 MB
12 - Appendix Z - Payment Items 72.4 KB