3rd & 2nd Avenue Storm Sewer - 2016199

This project consists of the construction of approximately, 1,800± linear feet of 12 inch to 18 inch diameter storm sewer, 11± drainage structures and several catch basin modifications, 5,800± cubic yards of rock excavation, 50± linear feet of sidewalk, 5,800± square yards of 7-inch inch thick asphalt pavement, sundry utility adjustments, and other related miscellaneous items.

Status

Accepting Bids

Bid Date2/25/19 1:00 pm

Company & Contacts

City of Spokane Engineering Dept.

Duane Studer, dstuder@spokanecity.org   (509) 625-6700

Location

Spokane, WA

Project Estimate: $1,920,000.00 to $2,120,000.00

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

Additional project information including the Engineer’s estimated cost range for the project, bid results (after bid opening), as well as information about other City projects are available by following this link for The City of Spokane Engineering Services.