RPWRF Maintenance & Warehouse HVAC Upgrade - 2019070

This project consists of the construction of the replacement and upgrade of the existing, aging, HVAC system in a portion of the maintenance and warehouse areas of the Spokane City, Riverside Park Water Reclamation Facility , and other related miscellaneous items.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - C-01 - Cover Sheet 1.5 MB
02 - M-01 - Mechanical Legend, Abbreviations & Notes 5.8 MB
03 - M-02 - Mechanical Schedules 4.9 MB
04 - M-03 - Partial Ground Floor Plan - HVAC - Demolition 3.9 MB
05 - M-04 - Partial Lower Level Ploor Plan - HVAC - Demolition 2.8 MB
06 - M-05 - Partial Ground Floor Plan - HVAC - New Work 4.2 MB
07 - M-06 - Partial Lower Level Floor Plan - HVAC - New Work 3.0 MB
08 - M-07 - Partial Roop Plan - HVAC - New Work 3.0 MB
09 - M-08 - Mechanical Details 4.6 MB
10 - M-09 - Mechanical Details 4.9 MB
11 - M-10 - Temperature Control Diagrams 5.3 MB
12 - M-11 - Temperature Control Diagrams 4.8 MB
13 - E-01 - Electrical Legend 6.1 MB
14 - E-02 - Electrical Demolition 2.7 MB
15 - E-03 - Electrical Power Plan 2.9 MB
16 - E-04 - Electrical Power Plan Mezzanine 2.8 MB
17 - E-05 - Electrical Roof Power Plan 2.7 MB