Five Mile Booster Station Replacement - 2017104

This project consists of the construction of a CMU Booster Station Building (approx. 72'- 8" Length by 20'-4" Wide by 16'-3" High), including vertical turbine line shaft pumps, motors, motor control centers, 12" and 18" to 30" diameter piping, paved access and parking area, electrical, backup power generation, plumbing, heating and cooling systems, excavation, site grading and restoration, water and sewer connections, electrical and conduit work, and other related miscellaneous items.

Status

Bidding Closed

Bid Date3/4/19 1:00 pm

Company & Contacts

City of Spokane Engineering Dept.

Cindy Kinzer ckinzer@spokanecity.org   (509) 625-6349

Location

Spokane, Eastern WA

Project Estimate: $2,300,000.00 – $3,100,000.00

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

Additional project information including the Engineer’s estimated cost range for the project, bid results (after bid opening), as well as information about other City projects are available by following this link for The City of Spokane Engineering Services.