Erie and Trent Storm Facility - 2015130

For the improvement of construction of storm sewer, detention storage facility including a duplex lift station, control and electrical components, retention and treatment utilities including a lined bioinfiltration swale, HMA pavement shared use path, concrete slabs, curb, conduit, landscaping trees and irrigation systems, and installation and misc. sundries items and other work.

Status

Accepting Bids

Prebid Date5/22/19 10:00 am

Bid Date6/3/19 1:00 pm

Company & Contacts

City of Spokane Engineering Dept.

Duane Studer, dstuder@spokanecity.org   (509) 625-6700

Location

Spokane, WA

Project Estimate: $2,370,000.00 to $2,630,000.00

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A non-mandatory pre-bid conference will be held at the Union Gospel Mission conference room at 1224 E Trent Ave at 10:00 a.m. on Wednesday, May 22, 2019. Attendance is strongly encouraged.

Additional project information including the Engineer’s estimated cost range for the project, bid results (after bid opening), as well as information about other City projects are available by following this link for The City of Spokane Engineering Services.