Post Street Bridge Replacement - 2017105

This project consists of the construction of approximately 800 cubic yards of excavation and embankment, 370 linear feet of 60-inch sanitary sewer, 2 sanitary sewer diversion vaults (for live sewer diversion), 380 linear feet of storm sewer, 3 drainage structures, 1 stormwater lift station, 500 linear feet of storm sewer force main, 480 linear feet of 18- inch water main, 600 tons of HMA pavement, sundry utility adjustments, 17,700 square feet of bridge superstructure demolition and replacement and other related miscellaneous items.

Status

Accepting Bids

Prebid Date2/13/20 1:30 pm

Bid Date3/16/20 1:00 pm

Company & Contacts

City of Spokane Engineering Dept.

See below  

Location

Spokane, WA

Technical questions (except water main south of bridge): Greg Hess, KPFF, 206-926-0512

Technical questions (water main south of bridge only): Jake Dial, City of Spokane Engineering Dept, 509-625-6700

Procedural/bidding questions: Dan Buller, City of Spokane Engineering Dept, 509-625-6700

Project Estimate: $18,000,000.00- $20,000,000.00

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A MANDATORY prebid conference will be held at the office of the Engineering Services Department, 808 W. Spokane Falls Boulevard, Spokane, WA, at 1:30 p.m. on February 13, 2020 in Conference Room 2B, 2nd floor, City Hall.

Additional project information including the Engineer’s estimated cost range for the project, bid results (after bid opening), as well as information about other City projects are available by following this link for The City of Spokane Engineering Services.