Post Street Bridge Replacement - 2017105

This project consists of the construction of approximately 800 cubic yards of excavation and embankment, 370 linear feet of 60-inch sanitary sewer, 2 sanitary sewer diversion vaults (for live sewer diversion), 380 linear feet of storm sewer, 3 drainage structures, 1 stormwater lift station, 500 linear feet of storm sewer force main, 480 linear feet of 18- inch water main, 600 tons of HMA pavement, sundry utility adjustments, 17,700 square feet of bridge superstructure demolition and replacement and other related miscellaneous items.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Project Information 1.2 MB
02 - Amendments to the Standard Specifications 86.2 KB
03 - Special Provisions 742.8 KB
04 - Special Provisions - Technical 1.6 MB
05 - Appendix A - Detail Drawings Online Only 20200130 43.8 MB
06 - Appendix C - City State Fed Inserts 20200130 1.5 MB
07 - Appendix E - Permits 20200130 1.5 MB
08 - Appendix P - Proposal 20200130 4.3 MB
09 - Appendix W - Wage Rates 20200130 1.3 MB