Public Jobs

Bids due in 15 days
9/4/18 1:00 pm
2013 Downtown Pedestrian Improvements - 2013156
City of Spokane Engineering Dept.
Spokane, WA
This project consists of filling sidewalk vaults at five locations in downtown Spokane and associated sidewalk removal replacement and other related miscellaneous items.
Bidding Closed
8/20/18 1:00 pm
Sprague and Sherman Plaza - 2015150
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 200 cubic yards of excavation and embankment, 4 drainage structures, 325 square yards of 4-inch thick HMA pavement, 2300 square feet of permeable unit pavers, traffic signal system, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
8/6/18 1:00 pm
Centennial Trail Mission Avenue Gap - Phase 1 (REBID) - 2014095
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 385 square yards of parking lot asphalt 3 inches thick, 1,250 linear feet of sidewalk, traffic signal retrofit, traffic island modifications, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
7/30/18 1:00 pm
Falls Avenue - Lower Crossing to Elm - 2017124
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 250 cubic yards of excavation and embankment, 65 linear feet of storm sewer, 2 drainage structures, 60 square yards of sidewalk, 720 feet of curb, 1,300 square yards of 4-inch thick HMA pavement, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
7/23/18 1:00 pm
Red Band Park River Access & Privacy Shelter - 2017186
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of an 80 foot long rail style boat ramp to the Spokane River from Glover Field, including excavation for and installation of structure footings, fabrication and installation of a metal rail boat launch, fabrication and installation of a metal access stairway, installation of a pre-fabricated steel privacy shelter, construction of a gravel access road, and other associated items required to construct the ramp.
Bidding Closed
6/25/18 1:00 pm
East Central Stormwater Improvements - 2016212
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately ±4,600 square yards of swale construction , ±800 linear feet of 8” to 15” sanitary / storm sewer, ±50 drainage structures, ±900 linear feet of chamber type french drain, ±1,200+/- linear feet of 4 inch conduit, ±4,800 linear feet of curb or curb and gutter, ±2,000 square yards of 4- inch thick HMA pavement repair, ±5,700 square yards of 2-inch thick HMA pavement, ±5,700 square yards of HMA grinding, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
6/25/18 1:00 pm
2018 Residential Grind and Overlay - South - 2018047
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 51,000 square yards of 2-inch thick HMA pavement, 4,100 square yards of pavement repair, 34,000 square yards of grinding, and 2,500 square yards of sidewalk, 26 drainage structures, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
6/18/18 1:00 pm
Sunset Boulevard from Royal Street to Lindeke Street - 2014094
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 48,000 square yards (5,300 cubic yards) of HMA grinding, 2,500 linear feet of storm sewer, 45 drainage structures, 8,000 linear feet of concrete and HMA sidewalk and trail, 48,000 square yards of 4-inch thick HMA pavement, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
5/21/18 1:00 pm
2018 Residential Grind and Overlay - North - 2018044
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 500± linear feet of storm sewer, 20± drainage structures, 1,300± square yards of sidewalk, 58,000 square yards of 2-inch thick HMA pavement, 4,000± square yards of 4-inch thick HMA pavement, 1,800± square yards of pavement repair, 30,000± square yards of grinding, and sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
5/14/18 1:00 pm
Sharp Avenue Stormwater Improvements - 2014040
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 16,000 cubic yards of excavation and embankment, 3,200 linear feet of 12” Ductile Iron Water Main, 250 linear feet of 6” Ductile Iron Water Main, 38 drainage structures, 12,300 square yards of 5-inch thick HMA pavement, 3,750 square yards of 8-inch thick Porous HMA pavement, 1,950 square yards of 9-inch thick Pervious Concrete Pavement, pavement sundry utility adjustments, and other related miscellaneous items.