Hamilton Street Corridor Intersection Improvements - 2010056
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately six traffic control signals, 5800 linear feet of directional boring, fiber optic cable and splicing, 7 catch basins, 5170 square yards of HMA pavement repair 3 inches thick, 9080 square yards of HMA pavement 2 inches thick, 1700 linear feet of curb or curb and gutter, 1400 square yards of sidewalk, 1700 linear feet of reinforced concrete curb, and 380 square yards of traffic island, signing, pavement markings, sundry utility adjustments, and other related miscellaneous items.
Bids due in 13 days
4/20/20 1:00 pm
Spokane Arterial Curb Ramp Project - South - 2018042
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 140 ADA accessible wheelchair ramps, including 5,000 linear feet curb removal and replacement, 2,800 square yards of sidewalk, pavement repair, sundry utility adjustments, and other related miscellaneous items.
Bids due in 9 days
4/16/20 12:00 pm
RFQ - Centennial Trail - Summit Blvd Geotechnical Engineering
City of Spokane Engineering Dept.
Spokane, WA
This work consists of the geotechnical engineering component of the design of the Centennial Trail – Summit Blvd project.
Bids due in 9 days
4/16/20 12:00 pm
RFQ - Centennial Trail - Summit Blvd Landscape Architecture
City of Spokane Engineering Dept.
Spokane, WA
This work consists of the landscape architecture component of the design of the Centennial Trail – Summit Blvd project.
Bids due in 6 days
4/13/20 1:00 pm
Kempe to Woodridge Transmission Main - 2015055
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 0.75 acres of clearing and grubbing, 3 underground precast concrete valve structures, 1290 linear feet of 12 inch water main, and other related miscellaneous items.
Bidding Closed
4/6/20 1:00 pm
Spokane Arterial Curb Ramp Project - North - 2019042
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 180 ADA accessible wheelchair ramps, including 6,000 linear feet curb removal and replacement, 3,500 square yards of sidewalk, pavement repair, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
3/16/20 1:00 pm
Sprague Ave. Rebuild 2B - 2019113
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 3500 cubic yards of excavation and embankment, 1312 linear feet of 24” ductile iron water main, 1302 linear feet of 24” Stormwater pipe, 530 linear feet of 21” sanitary sewer main, 200 linear feet of 24” sanitary sewer main, 11 drainage structures, 3000 square yards of sidewalk, 7050 square yards of 7-inch thick HMA pavement, illumination system, landscaping and sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
3/30/20 1:00 pm
Post Street Bridge Replacement - 2017105
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 800 cubic yards of excavation and embankment, 370 linear feet of 60-inch sanitary sewer, 2 sanitary sewer diversion vaults (for live sewer diversion), 380 linear feet of storm sewer, 3 drainage structures, 1 stormwater lift station, 500 linear feet of storm sewer force main, 480 linear feet of 18- inch water main, 600 tons of HMA pavement, sundry utility adjustments, 17,700 square feet of bridge superstructure demolition and replacement and other related miscellaneous items.
Bidding Closed
1/27/20 1:00 pm
Rowan Force Main & Water - 2017141
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 1,940 linear feet of 36' steel casing installed by boring and open cut, 2,925 linear feet each, of 8' and 12' ductile iron force main, 3,700 linear feet of 12' water main, 600 linear feet of 15' sanitary sewer main, 375 linear feet of 10' storm sewer, 1700 square yards of 8-inch thick HMA pavement, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
12/9/19 1:00 pm
Spokane Arterial Street Preservation Project - North (Phase 2) - 2018143
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 28,000 square yards of HMA pavement grinding, 900 linear feet of cement concrete curb, 400 square yards of sidewalk, 28,000 square yards of 2-inch thick HMA pavement, 1,000 square yards of pavement repair, 54,000 square yards of chip seal, including crack sealing, sundry utility adjustments, and other related miscellaneous items.