Public Jobs

Bids due in 3 days
8/22/17
CSO Basin 24 Control Facility (Phase 4) Bid Package 4 - (SUB-BIDS)
Walker Halme Joint Venture
Spokane, Eastern WA
BP4 – STRUCTURAL CONCRETE: Provide labor, equipment, forms and all miscellaneous material to construct approximately 6,500 cubic yard cast-in-place concrete structure. Also includes installing detention tank appurtenances that will be provided by other bid packages.
Bidding Closed
8/15/17
CSO Basin 24 Control Facility (Phase 4) Bid Packages 5 through 15 and 17 - (SUB-BIDS)
Walker Halme Joint Venture
Spokane, Eastern WA
BP5 – REBAR: Furnishing and installing reinforcing steel for approximately 6,500 cubic yards cast-in-place concrete structure. BP6 – CONCRETE SUPPLY: Supplying approximately 6,500 cubic yards structural concrete. BP7 – METAL FABRICATION: Supply and prefabricate all metal stairways, railings, weirs, baffles, columns, embeds, and all other miscellaneous metal items. BP8 – BALANCE OF PRECAST: Supply of all precast CSO tank appurtenances including all aluminum hatches and metal castings. Also includes supply of approximately 16 manholes, 4 drywells, 11 catch basins and one precast merge vault, 178 lf of 30” concrete pipe, and 262 lf of 54” concrete pipe. BP9 – WATERPROOFING: Supply and install approximately 1,514 sy of concrete wall waterproofing. BP10 – FLOW CONTROL DEVICES: Supply of GNA flow control devices including electroslide, flush gates and hydrocheck valves including delivery, startup and training of equipment. BP11 – ODOR CONTROL UNIT: Supply of three (3) odor control units and media including delivery, startup and training for equipment. BP12 – LIFT STATION PUMPS: Supply of three (3) submersible non-clog wastewater pumps (Flygt Movel NP-3153 LT 3-414) including delivery, startup and training for equipment. BP13 – BALANCE OF PROJECT PIPE: Supply all interior CSO plumbing pipe, fittings and fixtures, all exterior CSO mechanical pipe and fittings as well as all street pipe and fittings not including conduit or concrete pipe. BP14 – INTERIOR HVAC: Supply and installation of interior HVAC systems not including odor control units. BP15 – ELECTRICAL: Electrical as well as one traffic control system, site and street lighting, site and street communication systems and approximately 5,000 lf of conduit and trenching ranging from 2” to 4”. BP17 – STREET CONSTRUCTION: Construction of 10,249 sy of roadway including crushed surfacing, HMA, signs and striping, concrete curbs and sidewalks. Does not include any work within the landscaped areas.
Bidding Closed
8/7/17
Centennial Trail Mission Avenue Gap Phase 1 - #2014095
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 4,000 square yards of parking lot asphalt 3 inches thick, 700 square yards of mixed use trail 2 inches thick, 1,500 linear feet of sidewalk, traffic signal retrofit, traffic island modification, trail signing and striping, sundry utility adjustments and other related miscellaneous items.
Bidding Closed
7/24/17
Northside Landfill Erosion Repair - #2017122
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the hillside erosion repair construction, which includes approximately 3,000 cubic yards of excavation and embankment, 1,030 square yards of geotextile materials placement, 860 square yards of cellular confinement system, and other related miscellaneous items, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bidding Closed
7/24/17
2017 CD Sidewalk Project, 9th/Altamont Realignment/Lighthouse Pedestrian Crossing
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the removal and replacement of approximately 1,000 square yards of sidewalk and driveway, 600 linear feet of curb removal and replacement, removal of existing signing and striping and placement of permanent signing and striping, landscaping and irrigation, HMA for pavement repair, and other related miscellaneous items.
Bidding Closed
7/17/17
Crestline Street Lane Reduction - #2015052
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 8,100 square feet of pavement marking removal, 18,000 square feet of new pavement marking, permanent signing, traffic island removal and other related miscellaneous items.
Bidding Closed
7/10/17
2017 Street Maintenance Curb Ramp Projects - #2017042
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of curb ramps for streets that are part of the Maintenance Grind and Overlay program for the year. The ramp work is concentrated areas in different parts of the City consisting of approximately 4,900 linear feet of cement concrete curb, 2,400 square yards of sidewalk, sidewalk removal, concrete curb wall, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
6/26/17
Lincoln Gateway - #2016156
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 45 square yards of pavement repair excavation and HMA, 175 linear feet of concrete barrier, 85 linear feet of 24" wide traffic island, landscape and irrigation improvements, and other related miscellaneous items. Scope of work includes the following: Civil Construction
Bidding Closed
6/19/17
2017 Residential Grind & Overlay Projects - #2017044
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 1,400 cubic yards of excavation and embankment, 28,470 square yards of 2-inch thick HMA pavement, 4,000 square yards of 6-inch thick HMA pavement, 1,300 square yards of pavement repair, 12,400 square yards of grinding 600 linear feet of storm sewer, 12 drainage structures, 600 square yards of sidewalk, sundry utility adjustments, and other related miscellaneous items. Scope of work includes the following: Civil Construction
Bidding Closed
6/19/17
Residential Chip Seal Program 2017 - #2017043
City of Spokane Engineering Dept.
Spokane, Eastern WA
This project consists of the construction of approximately 180,000 square yards of chip seal, 190,000 linear feet of crack sealing, 3,200 square yards of 4-inch pavement repair, 30 square yards of sidewalk and ADA curb ramps, 10,000 square feet of pavement marking paint removal and replacement, and other related miscellaneous items.