Public Jobs

Bids due in 8 days
6/21/21 1:00 pm
Havana Well Station - 2019171
City of Spokane Engineering Dept.
Spokane
This project consists of the construction of two CMU buildings to house 6 vertical turbine pumps and motors, as well as the associated electrical and mechanical appurtenances to support the function of the well stations. Site improvements will include connections to existing water transmission mains, grading, paving, and landscaping. This project will take place within the City of Spokane Valley and the City of Spokane.
Bids due tomorrow at 1:00pm
6/14/21 1:00 pm
Cycle 8 (2018) Traffic Calming - 2018065, 066, 067
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 1,850 square yards of sidewalk, 50 linear feet of storm sewer, 2 drainage structures, 2150 linear feet of curb or curb and gutter, 650 square yards of 3-inch thick pavement patching, 335 square yards of 5-inch thick pavement patching, 1 Pedestrian Hybrid Beacon System – RRFB’s, 2 sets of “Driver Speed Feedback” signs, sundry utility adjustments, and other related miscellaneous items.
Bids due in 8 days
6/21/21 1:00 pm
Hoffman Well Rehabilitation - 2018104
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction and rehabilitation of the Hoffman Well, including vertical turbine line shaft pumps, motors, motor control centers, steel casing liner, concrete pedestal, 8”, 18” and 24” to 30” diameter piping, electrical, concrete vaults, excavation, site grading and restoration, structural modifications to well caisson, fencing, water and sewer connections, electrical and conduit work, and other related miscellaneous items.
Bidding Closed
6/7/21 1:00 pm
Wellesley-Maple Intersection - 2019107
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 90 square yards of sidewalk, 1500 square yards of 2-inch thick HMA pavement, 250 square yards of 10-inch thick cement concrete pavement, traffic signal modification, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
5/24/21 1:00 pm
2021 Residential Chip Seal Program - 2021043
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 79,000 square yards of chip seal, including associated crack sealing, pavement repair, and other related miscellaneous items.
Bidding Closed
5/10/21 1:00 pm
Water Yards East Parking Upgrade - 2021072
City of Spokane Engineering Dept.
Spokane
This project consists of the construction of approximately, 260+/- square yards of sidewalk, 1,000+/- linear feet of curb, finish grading & compaction of CSTC, 11,000+/- square yards of 3-inch thick HMA pavement, topsoil, landscaping, and irrigation for buffer areas and Spokanescape bioinfiltration swales, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
5/10/21 1:00 pm
2021 Arterial Chip Seal - 2021086
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 130,000 square yards of chip seal, including associated crack sealing, pavement repair, and other related miscellaneous items.
Bidding Closed
4/19/21 1:00 pm
Cycle 8 (2019) School Safety - 2019064, 065, 066
City of Spokane Engineering Dept.
Spokane
This project consists of the construction of approximately 2,603 square yards of sidewalk , 54 linear feet of storm sewer, 6 drainage structures, 3,556 linear feet of curb or curb and gutter, 1,400 square yards of 2-inch thick HMA trail, 2,000 square yards of 3-inch thick pavement patching, 220 square yards of 5-inch thick pavement patching, 2 Pedestrian Hybrid Beacon System – RRFB’s, 9 sets of “20 MPH when flashing” driver feedback signs, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
4/5/21 1:00 pm
Highway 902 Transmission Main Relocation - 2020101
City of Spokane
Spokane
This project consists of the construction of approximately 1,800 linear feet water transmission and distribution main, pavement repair, and other related miscellaneous items.
Bidding Closed
1/11/21 1:00 pm
Centennial Trail - Summit Blvd. Gap - 2017080
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 2700 cubic yards of excavation and embankment, 6100 square feet of Structural Earth Wall, 10 drainage structures, 5800 linear feet of curb, 5175 square yards of 2-inch thick HMA paved trail, sundry utility adjustments, and other related miscellaneous items.