Public Jobs

Bids due in 14 days
12/7/20 1:00 pm
2021 Street Maintenance ADA Ramps - 2020042
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 80 ADA accessible wheelchair ramps, including 2,700 linear feet curb removal and replacement, 1,600 square yards of sidewalk, pavement repair, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
10/26/20 1:00 pm
Surveying On-Call RFQ Non-Federal Aid Project 2021-2022
City of Spokane Engineering Dept.
Spokane, WA
The City of Spokane, through its Department of Engineering Services is initiating this Request for Qualifications (RFQ) to solicit Proposals from Firms with expertise in surveying.
Bidding Closed
10/26/20 1:00 pm
Real Estate Consultant On-Call RFQ Non-Federal Aid Project 2021-2022
City of Spokane Engineering Dept.
Spokane, WA
The City of Spokane, through its Asset Management Department is initiating this Request for Proposals (RFP) to solicit Proposals from Firms interested in participating on a project to provide work, right-of-way appraisal, environmental, acquisition, and relocation services for various projects.
Bidding Closed
10/26/20 1:00 pm
Historic Resources On-Call RFQ Non-Federal Project 2021-2022
City of Spokane Engineering Dept.
Spokane, WA
The City of Spokane, through its Department of Engineering Services is initiating this Request for Qualifications (RFQ) to solicit Proposals from Firms with expertise in historic resources.
Bidding Closed
10/26/20 1:00 pm
Geotech On-Call RFQ Non-Federal Aid Project 2021-2022
City of Spokane Engineering Dept.
Spokane, WA
The City of Spokane, through its Department of Engineering Services is initiating this Request for Qualifications (RFQ) to solicit Proposals from Firms with expertise in geotechnical engineering.
Bidding Closed
10/26/20 1:00 pm
Construction Management On-Call RFQ Non-Federal Project 2021-2022
City of Spokane Engineering Dept.
Spokane, WA
The City of Spokane, through its Department of Engineering Services is initiating this Request for Qualifications (RFQ) to solicit Proposals from Firms with expertise in construction management.
Bidding Closed
8/10/20 1:00 pm
Paving of Unpaved Streets - Napa Street & Altamont Street - 2019173 & 2019174
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 550 cubic yards of excavation and embankment, 3,000 square yards of preparation of untreated roadway, 3,000 square yards of 3-inch thick asphalt pavement, 300 cubic yards of crushed surfacing top course, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
7/27/20 1:00 pm
2020 Arterial Grind & Overlay North - Economic Recovery - 2020083
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the grind and overlay of arterial roadways at three separate locations in north Spokane. This project consists of the 71,700 square yards of 2-inch thick HMA pavement and planning of existing HMA pavement, 3,700 square yards of pavement repair excavation, 925 square yards of cement concrete sidewalk for ADA ramp construction, and 1,200 lineal feet of curb or curb & gutter, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
8/3/20 1:00 pm
South Gorge Trail Phase 2 & CSO 22 B Separation Projects - 2019138 & 2018111
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 5,600 cubic yards of excavation and embankment, 6,000 linear feet of storm, sanitary and clean water piping, 3,900 linear feet of waterline, 3,500 square yards of storm swale construction, of waterline, 110 drainage structures, 9,000 square yards of 5-inch thick HMA pavement, 3,500 square yards of 3-inch thick HMA pavement, 4,500 square yards of 2-inch thick HMA trail pavement, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
7/27/20 1:00 pm
2020 Arterial Grind & Overlay South - Economic Recovery - 2020087
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the grind and overlay of arterial roadways at three separate locations in north Spokane. This project consists of the 48,000 square yards of 2-inch thick HMA pavement and planning of existing HMA pavement, 10,200 square yards of pavement repair excavation, 300 square yards of cement concrete sidewalk for ADA ramp construction, and 425 lineal feet of curb or curb & gutter, sundry utility adjustments, and other related miscellaneous items.